[SMM Weekly Review] The cobalt sulphate market remained relatively sluggish this week, with limited transactions.

Published: Dec 25, 2025 15:32
The cobalt sulphate market remained relatively sluggish this week, with limited transactions. On the supply side, smelter quotations remained firm, with MHP and scrap-derived material offers holding at 91,000–92,000 yuan/mt, and intermediate products at 95,000 yuan/mt. On the demand side, inquiries decreased, with downstream enterprises only making sporadic restocking for essential needs. This was due to two factors: first, the concentrated stockpiling earlier had already achieved inventory targets; second, financial and inventory controls tightened during the earnings season, reducing willingness for additional stockpiling. Spot prices are expected to remain generally stable in December, with potential upward momentum anticipated in January when downstream enterprises resume a new round of procurement.

The cobalt sulphate market remained relatively sluggish this week, with limited transactions. On the supply side, smelter quotations continued to hold firm, with MHP and scrap-derived material offers maintained at 91,000–92,000 yuan/mt, and intermediate products at 95,000 yuan/mt. On the demand side, inquiries decreased, with downstream enterprises only making sporadic restocking for rigid needs: first, concentrated stockpiling earlier had already achieved inventory targets; second, financial and inventory controls tightened during the financial reporting season, leaving little willingness for additional stockpiling. Spot prices are expected to remain generally stable in December, with potential upward momentum anticipated after downstream enterprises resume a new round of procurement in January.


SMM New Energy Research Team

Cong Wang 021-51666838

Rui Ma 021-51595780

Disheng Feng 021-51666714

Yanlin Lü 021-20707875

Wenhao Xiao 021-51666872

Haohan Zhang 021-51666752

Zihan Wang 021-51666914

Jie Wang 021-51595902

Yang Xu 021-51666760

Lianting Yang 021-51595835

Zhaoyu Wang 021-51666827

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
10 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
10 hours ago